العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

3.. المخطط

Components, costs and activities that are directly linked to the plot. This refers to the actual (physical) plot. Category 3 - plot- includes all activities and construction components that are independent from the building (category 4 and 5) and can be used separately, for instance, traffic routes, supply pipes and cables until entering the building as well as plot equipment and facilities (wall, sandboxes, park benches). Costs directly linked to the plot, e.g. purchasing price, taxes, etc. can be found in category 1.
وحدة المرجعيةمتر مربع
أقل سعر لل 0.2 € (يورو)
متوسط السعر 0 € (يورو)
أقصى سعر10000 € (يورو)
0 EUR / 0 GBP / 0 JPY / 0 USD / 0 ARS / 0 AUD / 0 BRL / 0 CAD / 0 CHF / 0 CNY / 0 DKK / 0 IDR / 0 INR / 0 MXN / 0 MYR / 0 NOK / 0 RUB / 0 TRY /
الرابط الثابت / عنوان مباشرة:  ar/تكاليف و مكونات الإنشاء/سعر/المخطط_50751.htm