العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

1.14. Pajak, subsidi dan hibah

All expenses that have an impact on the construction project (due to political will). This can be the case in the form of charges, e.g. taxes, or financial grants, e.g. paying subsidies.
Unit referensipersen
harga minimum 5 € (Euro)
harga rata-rata 15 € (Euro)
harga maksimum25 € (Euro)
15 EUR / 13.35 GBP / 1950.3 JPY / 18.45 USD / 93.75 ARS / 23.85 AUD / 60.15 BRL / 23.85 CAD / 17.25 CHF / 117 CNY / 111.75 DKK / 254062.65 IDR / 1201.95 INR / 348.9 MXN / 72.15 MYR / 144.45 NOK / 1054.5 RUB / 70.35 TRY /
permalink / alamat langsung:  id/biaya konstruksi dan komponen/Harga/Pajak, subsidi dan hibah_50479.htm