العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

1.17.1 acara: peletakan batu pertama, upacara topping out, inaugurasi

Expenses regarding events related to the construction project, amongst other things laying of the foundation stone, topping out ceremony, inauguration.
Unit referensipotongan (satu)
harga minimum 0 € (Euro)
harga rata-rata 500 € (Euro)
harga maksimum20000 € (Euro)
500 EUR / 445 GBP / 65010 JPY / 615 USD / 3125 ARS / 795 AUD / 2005 BRL / 795 CAD / 575 CHF / 3900 CNY / 3725 DKK / 8468755 IDR / 40065 INR / 11630 MXN / 2405 MYR / 4815 NOK / 35150 RUB / 2345 TRY /
permalink / alamat langsung:  id/biaya konstruksi dan komponen/Harga/acara: peletakan batu pertama, upacara topping out, inaugurasi_50536.htm