1.16. biaya selama periode konstruksi, air, sewa, listrik, gas

Costs incurred during the construction phase. This includes additional rent payments or loss of rent, running costs such as facility management, maintenance costs. Not included in this category are costs related to the construction activities such as power consumed on the construction site.
Unit referensipotongan (satu)
harga minimum 300 € (Euro)
harga rata-rata 2000 € (Euro)
harga maksimum30000 € (Euro)
2000 EUR / 1780 GBP / 260040 JPY / 2460 USD / 12500 ARS / 3180 AUD / 8020 BRL / 3180 CAD / 2300 CHF / 15600 CNY / 14900 DKK / 33875020 IDR / 160260 INR / 46520 MXN / 9620 MYR / 19260 NOK / 140600 RUB / 9380 TRY /